Title 12, Chapter 15, Section 3
( 12-15-3)
As used in this chapter, the term: (1) "Construction period" means the period of time during which a
valid construction permit is in effect for a construction site. (2) "Construction site" means the property designated in a valid
construction permit issued by the local government having
jurisdiction of construction. (3) "Department" means the Department of Natural Resources. (4) "Sewage" means human excreta, all water carried wastes, and
liquid waste, including graywater or similar waste by-products. (5) "Sewage holding tank" means a portable receptacle used on a
temporary basis for containing sewage from flush toilets not
connected to a public sewer system or an approved on-site sewage
management system. (6) "Sewage holding tank system" means a closed system including
the plumbing fixtures and connections to the sewage holding tanks. (7) "Special event" means any activity attracting more than 50
persons which is sponsored, organized, promoted, managed, or
financed by any person, group, partnership, organization,
corporation, business, or government entity where individuals
congregate to participate in or observe an activity in outdoor or
portable enclosed or semienclosed structures for more than two
consecutive hours. |