Georgia State Code
Title      12
Chapter       5  
Section Navigation     1 ... 23.1     23.2 ... 29.1  
    30 ... 36         37 ... 45    
    46 ... 71         72 ... 97    
    98 ... 107       120 ... 129   
   130 ... 137       138 ... 174   
   175 ... 183       184 ... 193   
   210 ... 235       236 ... 245   
   246 ... 266       267 ... 288   
   289 ... 310       311 ... 327   
   328 ... 370         371 ... 379   
   380 ... 402       420 ... 446   
   447 ... 456       457 ... 478   
   479 ... 523       524 ... 547   
   548 ... 576       577 ... 586     
Section<<< 371 372 373 374 375 376 376.1 377 378 379 >>>  
Title 12, Chapter 5, Section 376.1 (12-5-376.1)

(a) For the purposes of this Code section:

(1) "Acre-feet" means the measurement of the impounding capacity of a dam as described in paragraph (4) of Code Section 12-5-372.

(2) "Height" means the height of a dam determined in the manner described in paragraph (4) of Code Section 12-5-372.

(3) "PMP" means probable maximum precipitation as determined by the United States Weather Service to be the greatest amount of rainfall of a six-hour duration which would be expected for a given location.

(b) All category I dams identified by the commission pursuant to Code Section 12-5-375 shall be subclassified by the director as follows:

(1) Small dams -- Those with a storage capacity not exceeding 500 acre-feet and a height not exceeding 25 feet.

(2) Medium dams -- Those with a storage capacity exceeding 500 acre-feet but not exceeding 1,000 acre-feet or a height exceeding 25 feet but not exceeding 35 feet.

(3) Large dams -- Those with a storage capacity exceeding 1,000 acre-feet but not exceeding 50,000 acre-feet or a height exceeding 35 feet but not exceeding 100 feet.

(4) Very large dams -- Those with a storage capacity exceeding 50,000 acre-feet or a height exceeding 100 feet.

(c) Permits issued pursuant to this part shall require minimum spillway design as follows:

(1) Small dams................................... 25 percent PMP

(2) Medium dams.................................. 33.3 percent PMP

(3) Large dams................................... 50 percent PMP

(4) Very large dams.............................. 100 percent PMP

Based on visual inspection and detailed hydrologic and hydraulic evaluation, including documentation of competent original design and construction procedures, up to a 10 percent lower requirement (22.5, 30, 45, 90) can be accepted, at the discretion of the director, provided the project is in an acceptable state of maintenance. The design storm may also be reduced if the applicant's engineer can successfully demonstrate to the director by engineering analysis that the dam is sufficient to protect against probable loss of human life downstream at a lesser design storm.

Thursday December 4 15:31 CST


This site exists because of donors like you.

Thanks!


Valid HTML 4.0!

Valid CSS!





Home - Tour - Disclaimer - Privacy - Contact Us
Copyright © 2000,2002,2004 Lawskills.com